“The floor hasn’t missed a beat under daily forklift traffic, and the phased install barely disrupted operations.”

Finish 07 of 10
Forklifts, pallet trucks, chemical spills and round-the-clock footfall. Heavy-duty epoxy and PU resin systems are sealed, impact-resistant and rated for continuous commercial use, installed in phases around your operating hours so your warehouse never has to close.
The finish
The floor commercial workshops and factories have used for decades, now specified for your warehouse.
Heavy-duty epoxy and PU resin systems are trowelled or self-levelled directly onto prepared concrete, then sealed with a hard-wearing topcoat rated for continuous forklift and pallet truck traffic. The result is seamless, dust-free and chemical-resistant, with walkway and safety-zone line marking built in from day one.
Read the specification

Where it works

Dust-free and rated for round-the-clock forklift traffic.

Chemical and impact-resistant where it matters most.

Seamless and safe around heavy machinery.

Clear line marking and safety zones as standard.
Why clients choose it
Phased overnight or weekend work keeps you operating.
Oils, solvents and cleaning agents wipe off.
Specified to your traffic load, from pedestrian to continuous.
No joints to break down or trap debris.
Walkways, zones and safety markings as standard.
A commercial system built for continuous use.
Projects







Specification
Every project is specified to the traffic load and chemical exposure of the space. These are the typical figures; your written quote confirms the exact build-up for your facility.
| System | Epoxy or PU resin screed, trowelled or self-levelling |
| Build thickness | 2 to 6mm depending on traffic load |
| Finish | Matte or satin, anti-slip and line marking included |
| Colours | Any RAL colour, safety yellow zones available |
| Typical install | Phased to suit your operating hours |
| Care | Pressure wash or scrub, chemical-resistant |

Questions
Yes. We work in phases, overnight or at weekends, so sections reopen as soon as they are cured and the rest of your operation keeps running.
Yes. The system is specified to the load and traffic level of your facility, from pedestrian areas to continuous forklift routes.
Yes. Walkway, hazard and zone marking is included as standard and can match your existing health and safety plan.
“The floor hasn’t missed a beat under daily forklift traffic, and the phased install barely disrupted operations.”
Related finishes

Next step
We come to your site, assess the traffic load and chemical exposure, talk through the system that suits it and give you a fixed written quote within 24 hours. No obligation, no hard sell.
Booking site visits for the next few weeks. Limited installation slots each month.